 100ton steel pusher reheating furnace before completion100ton steel pusher reheating furnace burner installation
 Gas furnace in construction 
 Reheating furnace pipelines
 Steel-pusher reheating furnace before completion Pusher-type reheating furnaceTechnical features:
 1. Simple structure and low cost
 2.Heating the upper and lower sides at the same time and fast heating speed.
 3.The furnace length is limited by the steel pusher, so it is not easy to extend the length, otherwise it is easy to arc the steel.
 4.The bottom pipes adopts the evaporative cooling way to reduce effectively the heating loss, while improving the quality of the heated work pieces.
 5.The furnace roof structure can be divided into flat and depressed type according to the different combustion way.Pusher-type reheating furnace is applied to such work piece shape: rectangular billet or square billet.
 Fuel: blast gas, coke oven gas, mixed gas, producer gas natural gas, fuel oil and so on;
 The burner type: high speed and Asian high speed burner, regenerative burners, proportion fuel burner and so on
 Heating capacity: 30~20t/h
 Heated steel type: carbon steel, alloy steel and stainless steel.
 The pusher type reheating furnace is used for heating the billet of the rolling mill
 |