Circular furnace process description

(1)   Charge

Steel billets are conveyed from feed roller to the predetermined position of charger →start the charger→ putdown arm of chargerready to grab billet→grip feed→ uplift the arm→ machine hand bogie move forward→ put down armready to discharge→grip release→ put up arm→ machine hand bogie move back

(2)    Furnace hearth rotate

Steel billets are rotated together with hearth with a different rotation angle of hearth every time. After several times, billets move from charge door to discharge door, preheated and heated when rotating with hearth. When Circular furnace normally produces, every rotation angle of hearth corresponds to a heated billet reaching discharge door, at same time a spare seat is ready for charge.

(3)   discharge

When there is a billet waiting for discharge  →open the discharger door→ uplift by discharger arm→ machine hand bogie move forward→ put down armready to grab billet→grip feed→ put up the arm→ machine hand bogie move back→ put down armready to discharge→ put billet to punch roller.

Normally producing, the process above is orderly coordinately and automatically controlled by PLC which is also of semi-automation and manual function.

30t/h regenerative typeΦ13.5m circular reheating furnace technical performance

NO.

NAME

UNIT

VALUE

1

Furnace usage

Billet reheating before punch

2

Furnace heating capacity

t/h

30

3

Billet specification

mm

billetφ100160mmL=15003300 mm

4

Heating temperature

1280

5

Fuel types low calorific value

Blast furnace gas KJ/m3

Q高炉=800×4.186

6

Rated Unit consumption

GJ/t

Cold package1.341.38

7

Fuel gas emitting  temperature

≤150

8

Hearth conveying ways

Three ring gear reducer

9

Charge/discharge ways

Machine manual charge/discharge

10

Tapping circle

s

20

11

Furnace type

Double regenerative blast furnace gas

Hot dirty gas Φ12mcicular reheating furnace technical specification

NO.

NAME

UNIT

VALUE

1

Furnace usage

Billet reheating before punch

2

Furnace heating capacity

t/h

15

3

Billet specification

mm

billetφ100160mmL=15002300 mm

4

Heating temperature

1280

5

Fuel types low calorific value

KJ/m3

Q发生炉=1400×4.186

6

Rated Unit consumption

GJ/t

Cold package1.46

7

Fuel gas emitting  temperature

≤350

8

Hearth conveying ways

Hydraulic push rod

9

Charge/discharge ways

Machine manual charge/discharge

10

Tapping circle

s

20

11

Furnace type

Hot dirty gas

 

 

 

 

 

 
Copyright:Nanjing Jinghuanre Metallurgy Engineering Co.,Ltd   Email:JingHR2010@163.com